Marampa Site Drilling and SPT Testing

Proportion
Assignment Drilling, SPT testing and sampling at the Marampa Site
Project Location Lunsar, Port Loko District
Client Marampa Mines Limited
Dates of Service February 2022 – March 2022

The Project Details

Summary of Key Activities:

This project entailed field exploration which consisted of the following activities at the Maramapa borehole location:

  1. Drilling of predetermined boreholes (six (6) holes were drilled)
  2. SPT Testing
  3. Collection of samples
  4. Laboratory activities

Engineering/Geologic evaluation and report preparation is also carried out by ISC.