Subsoil Investigation Works of Summa Airport

Proportion
Assignment Subsoil investigation works of 19 boreholes at a depth of 20m and pressure meter testing
Project Location Lungi
Client Summa Airport Sierra Leone
Dates of Service July 2021 – September 2021

The Project Details

This project covered the following field exploration activities for the soil investigation carried out for 19 boreholes with a depth of 20m.

  1. Drilling of predetermined boreholes
  2. Excavation
  3. Penetration Testing
  4. Collection of samples
  5. Rock coring
  6. Laboratory activities

Geotechnical evaluation and report preparation was also carried out by ISC for the first phase of the project.