Geotechnical Investigation for VIMETCO SMHL Tailing Storage

Proportion
Assignment Geotechnical Investigation for
SMHL Tailings Storage Facilities at Vimetco SMHL
Project Location Sierra Rutile
Client VIMETCO Street
Dates of Service October 2021 – November 2022

The Project Details

This project entailed a site reconnaissance survey which was conducted to review the current conditions of the site and also to take into account the surface features in alignment to the proposed project.

Activities carried out includes:

  1. Drilling of predetermined boreholes
  2. Excavation
  3. CPT/SPT Testing
  4. Collection of samples
  5. Rock coring
  6. Laboratory activities

Engineering/Geologic evaluation and report preparation was also carried out by ISC.